Battery and inverter in one cabinet, with PV input connectivity and three specified storage configurations. AC output options depend on the selected configuration.

INVERTER  Included

ENCLOSURE  Not specified

NOMINAL ENERGY  10.24–20.48 kWh

AC CONFIGURATION  120 V US / 230 V EU AC options

[Start your project ↗](https://pk.elvorka.com/en/#enquiry)

## Specifications

| Model / configuration | Energy (kWh) | AC options (kW) |
| --- | --- | --- |
| TA6000-M2 | 10.24 | 6–10 |
| TA6000-M3 | 15.36 | 6–12 |
| TA6000-M4 | 20.48 | 6–12 |

Specify the correct market AC voltage and 50 / 60 Hz option. PV input: 11 kW for M2; 11–13.2 kW for M3/M4. No three-phase or split-phase capability is claimed.

| Model | Dimensions (mm) | Approx. kg |
| --- | --- | --- |
| TA6000-M2 | 590 × 570 × 1880 / W × D × H | 244 |
| TA6000-M3 | 590 × 570 × 1880 / W × D × H | 286 |
| TA6000-M4 | 590 × 570 × 1880 / W × D × H | 328 |

Communication: RS485 / RS232 / CAN / Wi-Fi; Bluetooth optional
Temperature: Operating −20 to 60 °C

## From a city utility room to a cooler service space, plan for your home.

Pakistan’s plains, coast and northern uplands have different climate conditions. Keep selected household essentials in the plan, then match the battery format and protected equipment space to the room’s actual heat, moisture exposure and winter temperature.

Temperature:  Operating −20 to 60 °C

ENCLOSURE  Not specified

01

### Urban lowland home: fans, refrigeration and connectivity

A dry utility room gives a household energy reserve a dedicated place near the selected circuits it supports. In warmer lowland locations, the room’s airflow and heat belong alongside the appliance list in the plan.

EU combines battery and inverter for a new indoor IP21 installation. Where a suitable inverter already exists, TR Pro offers compact 51.2 V storage; select energy capacity around the desired hours and preserve cooling and service access.

Which lights, fans, refrigeration and network devices should be supported?

- What is the highest expected temperature inside the equipment room?

02

### Coastal home: protected storage and accessible connections

A sheltered service room can organise storage for a coastal household’s selected essential circuits. Describe actual coastal air, water and condensation exposure so the equipment location becomes part of the design.

Compare a compact TR Pro battery with modular HP Ultra storage, both listed with IP66 enclosures. Choose the electrical architecture for the compatible inverter and the housing for the proposed protected position.

Can coastal air, rain, wash water or condensation reach the proposed location?

- Is the existing inverter a 51.2 V or high-voltage battery system?

03

### Cooler equipment space: a reserve with a seasonal plan

Northern uplands are cooler than the lowlands, and an unheated equipment room needs its own minimum-temperature assessment. A dedicated dry space keeps the installation accessible while the charging plan follows the actual room.

Choose integrated storage for a new complete system or battery-only storage for a compatible inverter. Several supplied families list charging from 0 °C; discuss any explicitly supported TR heating option for the exact configuration when a colder room is involved.

What are the lowest and highest expected room temperatures?

- What charging protection and confirmed heating options apply to the selected model?

Specifications

- Use kWh to plan energy for the desired duration and kW to check which selected circuits can run together. Confirm inverter AC output, battery current limits and motor/compressor starting requirements for the final system.

- TR Pro lists charging at 0 to 55 °C and discharging at −20 to 60 °C; EU lists charging at 0 to 55 °C and discharging at −20 to 55 °C. HP Ultra’s temperature range needs selected-configuration confirmation. A temperature range is not a full-output derating curve.

- Choose the exact housing with the installation space. TR Pro/HP Ultra list IP66, EU IP21 and TB rack IP20; TR standard and HP K list IP20 with IP54 optional. Shelter, water exposure, condensation and coastal corrosion still need project-specific assessment.

PRODUCT DETAIL / ORIGINAL LITERATURE

## Every side. Every connection.

The supplied brochure provides two labelled connection/breaker insets and internal cabinet/cell illustrations on printed pages 15-16. Crops avoid visible product logos without AI editing, repainting, or invented structure. Embedded views not visibly matched to the printed product page were excluded. These views do not establish pinouts, cable sizes, commissioning steps or installation compatibility.

[![Original terminal labels](https://pk.elvorka.com/assets/product-details/ta-terminal-map.png)](https://pk.elvorka.com/assets/product-details/ta-terminal-map.png)

Original terminal labels  Connection panel labelled for load, grid, optional generator, PV and communication.

[![Terminal panel close-up](https://pk.elvorka.com/assets/product-details/ta-terminal-closeup.png)](https://pk.elvorka.com/assets/product-details/ta-terminal-closeup.png)

Terminal panel close-up  Close-up of the cabinet terminal panel.

[![Original breaker labels](https://pk.elvorka.com/assets/product-details/ta-breaker-map.png)](https://pk.elvorka.com/assets/product-details/ta-breaker-map.png)

Original breaker labels  Battery, PV1, PV2, load and grid breakers in the illustrated compartment.

[![Breaker compartment close-up](https://pk.elvorka.com/assets/product-details/ta-breaker-closeup.png)](https://pk.elvorka.com/assets/product-details/ta-breaker-closeup.png)

Breaker compartment close-up  Circuit breakers within the cabinet's breaker compartment.

[![Upper cabinet and service bay](https://pk.elvorka.com/assets/product-details/ta-service-bay.png)](https://pk.elvorka.com/assets/product-details/ta-service-bay.png)

Upper cabinet and service bay  Upper cabinet compartment with the inverter and connection area.

[![Cell assembly detail](https://pk.elvorka.com/assets/product-details/ta-cell-assembly.png)](https://pk.elvorka.com/assets/product-details/ta-cell-assembly.png)

Cell assembly detail  Battery cell tops in a partial internal illustration.

### Know your interfaces.

#### Power connections

Load Output  Output position identified as Load Output in the brochure.

Grid Input  Connection position identified as Grid Input.

Generator Input (optional)  The generator input is explicitly marked optional in the original callout.

PV Input  PV connection area identified by the original callout.

PV1 Input Breaker  Breaker identified for PV1 Input.

PV2 Input Breaker  Breaker identified for PV2 Input.

#### Communication

Communication Port  Connection area labelled Communication Port. No protocol pin assignments are specified in this component view.

#### Controls & indicators

Battery Breaker  Breaker labelled for the battery section.

Load Breaker  Breaker identified for the load connection.

Grid Breaker  Breaker identified for the grid connection.

Source: Residential ESS brochure · PDF page 8 · printed pages 15-16

---